The aluminum alloy tube truss should be used together with the base, sleeve, top, hoist and other truss systems and accessories. First, make sure the tower systems are erected, and then the beam is assembled and connected under it. Finally, the beam is hoisted by the hoist and various lighting and sound equipment are hung on it.
Methods and steps for construction:
1、Position the four bases roughly on the ground and adjust the lower legs so that they are in a horizontal plane
2、Insert the corner brace on the outside of the base at the four corners. Insert 2 corner brace at each corner, a total of 8 corner braces.
3、Fix the Hinge on the first one Meter truss of base with steel pin. Make sure that the direction of rotation of the hinge is consistent with that indicated in the figure
4、put the sleeve after assembled Hinge;
5、Connect the beams on the ground;
6、Connect the two ends of the beam to sleeves on both sides after the beam is assembled on the ground.
7、the tower systems lying flat with hinge, Assembling the top on the tower, hanging hoist and the cross arm at the top of the tower system, the hoist is used to lift the lower beam pipe truss
8、Slowly up straight the tower system by around 6 people, taking care not to push the column too hard, and then fix the pin into the hinge to make sure the tower system is up straight.
9、 hook the hoist on the top section to lift up the beams after the tower system is erected.
10、 slowly pull up the beam to around 2M height of the construction by 4 people.
11、Install lighting and sound equipment on the beam;
12、Pull the hoist together by 4 people to a predetermined height and stop
13、Place a tube under the top section to act as a safeguard then the construction is completed.
Methods and steps for construction:
1、Position
the four bases roughly on the ground and adjust the lower legs so that they are
in a horizontal plane
2、Insert
the corner brace on the outside of the base at the four corners. Insert 2 corner
brace at each corner, a total of 8 corner braces.
3、Fix
the Hinge on the first one Meter truss of base with steel pin. Make sure that
the direction of rotation of the hinge is consistent with that indicated in the
figure
4、put
the sleeve after assembled Hinge;
5、Connect
the beams on the ground;
6、Connect
the two ends of the beam to sleeves on both sides after the beam is assembled
on the ground.
7、the
tower systems lying flat with hinge, Assembling the top on the tower, hanging
hoist and the cross arm at the top of the tower system, the hoist is used to
lift the lower beam pipe truss
8、Slowly
up straight the tower system by around 6 people, taking care not to push the
column too hard, and then fix the pin into the hinge to make sure the tower
system is up straight.
9、 hook the hoist on the top section to lift up the beams after the tower system is
erected.
10、 slowly pull up the beam to around 2M height of the construction by 4 people.
11、Install
lighting and sound equipment on the beam;
12、Pull
the hoist together by 4 people to a predetermined height and stop
13、Place
a tube under the top section to act as a safeguard then the construction is completed.